The Continuing History of the project :-

More Blocks
Stage 11 More Blocks

Good grief these blocks don't half go up a pace!!!

It is amazing just how fast these blocks go up once they get going it starts to take shape at a pace. With the gaps for the windows and French Doors you start to get a real feel for the extension.

More Blocks

Even More Blocks
Stage 12 Up to Wall Plate

Within a few days the block work is up to wall plate level. Not long now until the roof!!!

Even More Blocks

Front Brickwork
Stage 13 End of Brickwork and Wall Plate

The brickwork at the front goes in - the bricks are a pretty close match to the existing front.

The wall plate is bedded in and we are ready now to start the roof.

Wall Plate

Roof 1
Stage 14 The Roof is Started
The roof certainly goes up at a pace - it is quite amazing how fast they can put up the first timbers once that the angles have been worked out - I was keen to keep the flat roof bit as small as possible - that meant we had to have a different type of tile on the back to get the minimum slope
Roof 2

Roof 3
Stage 15 More Roof Timbers
Once the basic frame is in place the corner sections get filled in - you can now see the basic structure and where the flat roof section is and where the Veluxes are going
Roof 4